Doors

Trade aluminium bifold doors

Thermally broken aluminium bifold doors that fold back to open most of the width of the opening. Supplied as a complete set with frame, panels, running gear and handles, in the configuration and RAL colour you choose.

Product code
TG-D05
Guide trade price
£1,450 to £3,950 per set, ex VAT, supply only
Lead time
Aluminium doors are typically made in 4 to 5 weeks from a confirmed order.
Delivery
UK-wide to site, yard or unit, priced on your quote
Category
Doors
Anthracite aluminium bifold doors folded fully open on a single-storey kitchen extension at sunset
WH

Typical layout. W and H are the frame or glass sizes you give us.

What is in the specification?

  • Thermally broken aluminium frame and panels
  • Top-hung or bottom-rolling running gear depending on system
  • Two to seven panels, folding in or out
  • Traffic door option for everyday access
  • Toughened double or triple glazed units
  • Multi-point locking
  • Powder coated to RAL, single or dual colour
  • Low or flush threshold options

Options you can add

  • Traffic door
  • Dual colour
  • Triple glazing
  • Flush threshold
  • Integral blinds
  • Solar-control glass

Who orders trade aluminium bifold doors?

Mostly builders and main contractors, conservatory and extension specialists, window and door installers and housing developers. Typical uses include kitchen and living extensions; garden rooms and orangeries; restaurant and café frontages.

Bifold doors are specified by overall width, number of panels and how they fold. Your quote shows the configuration so you can check it against the opening before production.

A traffic door is a single panel that opens like a normal door, so the set does not have to be folded back just to step outside.

The opening above a bifold carries the weight, so the lintel must be level and stiff enough. Check this with the builder before the doors arrive.

Flush thresholds give a level transition inside to outside but need a drainage detail outside. Tell us if you need one so the right threshold is supplied.

How should you measure?

The structural opening above a bifold carries the running gear, so confirm the lintel or steel is level and can take the load before you give us final sizes.

Which building regulations apply?

Replacement external doors in England should meet a U-value of 1.4 W/m²K under Approved Document L. Glass in doors and side panels below 1500mm is a critical location under Approved Document K, so it must break safely (toughened or laminated to BS EN 12600), be robust or in small panes, or be permanently protected. Doors into new homes also need to meet Approved Document Q for security, which is usually shown with PAS 24. Replacing a door that is more than half glazed is notifiable building work, self-certified through a competent person scheme or approved by building control.

Wales

In Wales, replacement external doors must meet Approved Document L (Wales), and glass in doors and side panels in critical locations must meet the safety glazing guidance in Approved Document N, usually with toughened or laminated safety glass. Replacing a door that is more than half glazed is notifiable building work, self-certified through a competent person scheme or approved by building control.

Scotland

In Scotland, replacement doors in a house do not normally need a building warrant, but they must still meet the building standards in the Technical Handbooks, including energy and safety glazing. Check with the local authority for flats, listed buildings and conservation areas.

Northern Ireland

In Northern Ireland, replacement doors should meet the energy guidance in Technical Booklet F1, and glass in doors and side panels the glazing safety guidance in Booklet V. Check with your council's building control service before work starts.

More detail: Approved Document L guide safety glazing guide. Your installer or designer remains responsible for compliance and any notification.

How ordering works

  1. List what you need

    One line per window, door or unit, with width, height and finish.

  2. Check your quote

    We price each item and flag anything that needs clarifying.

  3. Confirm the order

    Production starts only after you approve the written order.

  4. Receive your goods

    We aim to deliver on the confirmed date; check the goods against the delivery note.

Questions trade customers ask

How many panels should a bifold door have?

That depends on the width and how you want the panels to stack. As a rough guide, each panel is up to about a metre wide; we will suggest a layout when you send the opening size.

Do bifolds fold inward or outward?

Either. Outward folding is more common because it keeps the panels out of the room.

What is a traffic door?

A single panel that opens like a normal door for everyday use, without folding the whole set.

Can you match the colour to aluminium windows?

Yes. Order them together in the same RAL colour.

Request trade prices

Send your sizes and we return an itemised trade quote.

We use these details to reply to your enquiry. See our privacy notice.

CallWhatsAppTrade prices