Trade conservatory roofs
Replacement roof systems for existing conservatories, including lightweight tiled roofs and glazed roofs, made to the sizes of the existing frames. Supplied as a kit for your installer with structural components, roof covering and trims.
- Product code
- TG-R03
- Guide trade price
- £2,450 to £6,950 per roof, ex VAT, supply only
- Lead time
- Lead times for conservatory roofs vary with size and spec. We give you the date when we acknowledge your order.
- Delivery
- UK-wide to site, yard or unit, priced on your quote
- Category
- Roof glazing

Typical layout. W and H are the frame or glass sizes you give us.
What is in the specification?
- Engineered lightweight roof structure
- Tiled or glazed roof coverings
- Made to existing frame dimensions
- Internal plastered or boarded ceiling options
- Gutters, fascias and trims included
- Insulation build-up for solid roofs
- Supplied with installation instructions
Options you can add
- Lightweight tiles in several colours
- Glazed panels within a tiled roof
- Internal lighting provision
- Pelmet and ceiling finishes
- Self-cleaning glass
Who orders trade conservatory roofs?
Mostly conservatory and extension specialists, window and door installers and builders and main contractors. Typical uses include turning a conservatory into a year-round room; replacing failed polycarbonate roofs; updating glazed roofs.
A replacement roof is designed around the existing conservatory, so we need its style, frame sizes and photos before we can give a firm price.
In England and Wales, replacing a glazed or polycarbonate conservatory roof with a solid tiled roof usually means the conservatory is no longer exempt from building regulations, so approval from building control is normally needed.
The existing frames and base must be able to take the new roof. Your installer or a structural engineer should check this before ordering.
Tiled roofs often include glazed panels to keep some daylight. Tell us how many you want when you request a quote.
How should you measure?
Replacement roofs are designed from a site survey of the existing conservatory, including frame sizes, wall plate positions and roof style. Send photos and measurements with your enquiry.
Which building regulations apply?
Replacement rooflights and roof lanterns in England should meet a U-value of 2.2 W/m²K under Approved Document L. A lantern in a new extension is covered by the extension's own building regulations approval. Replacing a glazed or polycarbonate conservatory roof with a solid roof usually takes the conservatory out of the exemption, so building control approval is normally needed.
Wales
In Wales, rooflights and lanterns must meet the thermal requirements in Approved Document L (Wales). Changing a conservatory's glazed roof to a solid roof will normally need building control approval. Check the detail with the local authority building control team.
Scotland
In Scotland, new rooflights and lanterns in an extension are covered by the extension's building warrant. For changes to a conservatory roof, check with the local authority verifier whether a warrant is needed.
Northern Ireland
In Northern Ireland, rooflights and lanterns should meet the energy guidance in the Technical Booklets. Check with your council's building control service before changing a conservatory roof.
More detail: Approved Document L guide safety glazing guide. Your installer or designer remains responsible for compliance and any notification.
How ordering works
List what you need
One line per window, door or unit, with width, height and finish.
Check your quote
We price each item and flag anything that needs clarifying.
Confirm the order
Production starts only after you approve the written order.
Receive your goods
We aim to deliver on the confirmed date; check the goods against the delivery note.
Questions trade customers ask
Do I need building regulations approval to put a tiled roof on a conservatory?
In England and Wales a solid roof usually takes the conservatory out of the building regulations exemption, so building control approval is normally needed. Rules differ in Scotland and Northern Ireland; check locally.
Can the existing frames take a tiled roof?
That must be checked on site by your installer or an engineer. The roof system is designed around what is there.
Do you fit the roof?
No, we supply the roof kit to trade customers for their own installers to fit.
How long does a replacement roof take to make?
The date is confirmed when the design is signed off and the order placed.
Trade conservatory roofs by area
Area pages cover delivery and the regulations that apply where the job is.
